Heat dissipating cover of amplifier in 6063-T5 alloy with sandblasting & red anodizing

Product Feature

  • Excellent Thermal Conductivity (6063-T5 Alloy)
    6063 aluminum has high thermal conductivity (~200–220 W/m·K), efficiently transferring heat away from amplifier components (transistors, transformers, etc.).
  • Increased Surface Area for Heat Dissipation
    The cover is designed with fins or ribbed structures — 6063-T5 is highly extrudable, allowing complex, thin-walled fin geometries for maximum surface area.
  • Sandblasting Improves Thermal Performance & Finish
    Sandblasting creates a micro-rough surface, which slightly increases the effective surface area for heat exchange with air.
  • Red Anodizing Provides a Hard, Protective Layer
    Anodizing converts the aluminum surface into a durable, corrosion-resistant aluminum oxide layer.Corrosion resistance: Protects against humidity, sweat, or accidental liquid spills — common in live sound or workshop environments.
  • Visual & Branding Advantages
    Red color is often associated with high-performance, pro-audio, or boutique amplifier brands (e.g., McIntosh, Roksan, many tube amps).
  • Lightweight Yet Rigid
    6063-T5 offers good strength (yield ~145–190 MPa) for its weight — much lighter than steel or copper heatsinks.
    Reduces overall amplifier weight without compromising structural integrity for rack mounting or portable use.

Product Details

Use: cover for amplifier and dissipating the heat generated by amplifier

Material: Aluminum alloy 6063-T5 per AA standard, other aluminum alloy is also available

Dimension: multiple size per client’s requirements

Weight: to be determined per actual product

Processing: Alloy melting-Extruding-cutting- stamping-deburr-sandblasting-anodizing-appearance checking and packing

OEM/ODM: per customer’s requirements. We can develop new products together.

Surface Treatment: Sand blasting and satin anodize or black anodize or painting or powder coating

Packaging: Each pc in polybag, 30pcs into carton, then packed with pallet, customized packing is also available

Production Leading Time: For items per customer’s specification, mold developing and sample confirmation is 12-15 days, production leading time is 15-20 days after sample confirmed.

MOQ: 1000pcs

Supply Ability: 150000 pcs per Month

Payment Terms: 30% deposit before production, the balance paid before loading.

Port: Shenzhen or Guangzhou

Place of Origin: Guangdong, China

Certifications: ISO9001, ISO14001, ISO45001, RCV, and GRS

 

  • Peter Bali
  • Lewis Yu